4 Protection Products
VSC, GAP, Tire & Wheel, and Theft coverage across all eligible BRP product lines
400 Dealer Network
Phased enrollment over 18 months with dedicated onboarding support
194,531 Annual Contracts
Projected at base penetration rates across 216,147 total US units
90-Day Launch
Program goes live within 90-120 days with phased ramp to full production
5% YoY Growth
Year 3 projected at 214,471 contracts with compounding unit growth
90% Overall Penetration
Blended penetration across all product lines at base scenario targets
| Product | Full Name | New Units | Used Units | Total Units | % of Total |
|---|---|---|---|---|---|
| ATV | All-Terrain Vehicles | 31,972 | 2,739 | 34,711 | 16.1% |
| SSV | Side-by-Side Vehicles | 81,488 | 18,359 | 99,847 | 46.2% |
| PWC | Personal Watercraft | 34,383 | 10,217 | 44,600 | 20.6% |
| SNOW | Snowmobiles | 23,464 | 2,520 | 25,984 | 12.0% |
| 3WV | 3-Wheel Vehicles | 9,219 | 1,786 | 11,005 | 5.1% |
| TOTAL | 180,526 | 35,621 | 216,147 | 100% |
Contracts by Product & Type
Penetration Rate by Product (%)
Contract Type Mix
VSC Penetration
30%
64,844 contracts
GAP Penetration
20%
43,229 contracts
T&W Penetration
20%
43,229 contracts
Theft Penetration
20%
43,229 contracts
Overall Penetration
90.0%
194,531 contracts
| Product | Total Units | VSC Cts | GAP Cts | T&W Cts | Theft Cts | Total Cts | VSC Pen | GAP Pen | T&W Pen | Theft Pen | Overall Pen |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ATV | 34,711 | 10,413 | 6,942 | 6,942 | 6,942 | 31,239 | 30.0% | 20.0% | 20.0% | 20.0% | 90.0% |
| SSV | 99,847 | 29,954 | 19,969 | 19,969 | 19,969 | 89,861 | 30.0% | 20.0% | 20.0% | 20.0% | 90.0% |
| PWC | 44,600 | 13,380 | 8,920 | 8,920 | 8,920 | 40,140 | 30.0% | 20.0% | 20.0% | 20.0% | 90.0% |
| SNOW | 25,984 | 7,795 | 5,197 | 5,197 | 5,197 | 23,386 | 30.0% | 20.0% | 20.0% | 20.0% | 90.0% |
| 3WV | 11,005 | 3,302 | 2,201 | 2,201 | 2,201 | 9,905 | 30.0% | 20.0% | 20.0% | 20.0% | 90.0% |
Conservative
VSC 20% | GAP 12% | T&W 12% | Theft 12%
Total Contracts
121,043
Overall Penetration
56.0%
VSC Contracts
43,229
Base
VSC 30% | GAP 20% | T&W 20% | Theft 20%
Total Contracts
194,531
Overall Penetration
90.0%
VSC Contracts
64,844
Aggressive
VSC 40% | GAP 28% | T&W 28% | Theft 28%
Total Contracts
268,022
Overall Penetration
124.0%
VSC Contracts
86,459
New Dealers / Month
22
First Production
Month 5
Full Network Active
Month 22
Contracts / Dealer / Mo
40.5
Launch Phase
Months 1-3
Setup & onboarding
Ramp Phase
Months 4-6
25% to 75% capacity
Full Production
Month 7+
100% capacity
Steady-State / Mo
16,211
contracts / month
| Year | Growth | Units | Contracts | Pen % |
|---|---|---|---|---|
| Year 1 | 1.00x | 216,147 | 194,531 | 90.0% |
| Year 2 | 1.05x | 226,954 | 204,260 | 90.0% |
| Year 3 | 1.10x | 238,302 | 214,471 | 90.0% |
Commission Rate per Contract
VSC
$100 /contract
GAP
$50 /contract
T&W
$50 /contract
Theft
$50 /contract
Monthly & Annualized Commission Revenue
| Product | Rate | Monthly Contracts | Monthly Commission | Annual Contracts | Annual Commission |
|---|---|---|---|---|---|
| VSC | $100 | 5,404 | $540,367 | 64,844 | $6,484,400 |
| GAP | $50 | 3,602 | $180,121 | 43,229 | $2,161,450 |
| T&W | $50 | 3,602 | $180,121 | 43,229 | $2,161,450 |
| Theft | $50 | 3,602 | $180,121 | 43,229 | $2,161,450 |
| Total | -- | 16,211 | $1,080,729 | 194,531 | $12,968,750 |
Monthly Commission
$1,080,729
16,211 contracts/mo
Annual Commission
$12,968,750
194,531 contracts/yr
Per Dealer / Month
$2,702
40.5 contracts/dealer/mo
Per Dealer / Year
$32,422
across 400 dealers
Year 1 Commissions
$2,161,450
32,422 contracts
Year 2 Commissions
$10,266,800
154,004 contracts
Year 3 Commissions
$12,968,400
194,532 contracts
3-Year Total
$25,396,650
380,958 total contracts
Steady-State Monthly Earnings
$1,080,700/month
Once all 400 dealers are producing (16,211 contracts/mo) at $100 VSC + $50 GAP + $50 T&W + $50 Theft per contract
| Year | Contracts Sold | VSC Commission | GAP Commission | T&W Commission | Theft Commission | Total Commission | Avg/Month |
|---|---|---|---|---|---|---|---|
| Year 1 | 32,422 | $1,080,700 | $360,250 | $360,250 | $360,250 | $2,161,450 | $180,121 |
| Year 2 | 154,004 | $5,133,500 | $1,711,100 | $1,711,100 | $1,711,100 | $10,266,800 | $855,567 |
| Year 3 | 194,532 | $6,484,800 | $2,161,200 | $2,161,200 | $2,161,200 | $12,968,400 | $1,080,700 |
| 3-Year Total | 380,958 | $12,699,000 | $4,232,550 | $4,232,550 | $4,232,550 | $25,396,650 | $705,463 |
Contracts / Dealer / Month
40.5
at steady state
Commission / Dealer / Month
$2,702
avg across all products
Commission / Dealer / Year
$32,422
at full production
Avg Commission / Contract
$66.67
blended across VSC/GAP/T&W/Theft
PCMI Per-Contract Fee
$4
per contract processed
PCMI System Fee
$7,000/mo
Absorbed by Amynta
Visor Analytics -- Build
$149,000
Absorbed by Amynta
Visor Analytics -- Front End
$114,000
Billable to BRP
Detailed Cost Breakdown
| Vendor | Item | Rate | Quantity | Annual Cost | Billed To |
|---|---|---|---|---|---|
| PCMI | Per-contract processing fee | $4/contract | 194,531 contracts/yr | $778,124 | Per Contract |
| PCMI | TPA system / platform fee | $7,000/month | 12 months | $84,000 | Absorbed by Amynta |
| Visor Analytics | BRP product build-out -- dedicated resources | 3 resources x $55/hr | 1,500 hours | $149,000 | Absorbed by Amynta |
| Visor Analytics | Custom front-end build for BRP | 1 resource | Fixed project | $114,000 | Billable to BRP |
| Total Program Investment | $1,125,124 | ||||
Cost Allocation Summary
Absorbed by Amynta
$233,000
- PCMI system fee$84,000/yr
- Visor product build$149,000
Billable to BRP
$114,000
- Custom front-end build$114,000
Per-Contract (Ongoing)
$4/contract
- Annual estimate$778,124
- Based on 194,531 contracts
Project Overview
Amynta Warranty (Warranty Solutions BRP) aims to expand beyond VSC and onboard additional products (Tire & Wheel, Paint/Fabric, GAP) into the PCMI environment, mirroring the Sym-Tech setup. The project covers system setup, integrations, adjudication configuration, reporting, and readiness for an August launch (conference target).
Project Objectives
In Scope
- New product configuration (T&W, Paint/Fab, GAP)
- Environment setup & TPA code creation
- Contract and claim workflows (split adjudication)
- Menu integrations (Lightspeed + potential others)
- API requirements definition and connectivity
- Data pipeline setup for reporting (contracts & claims)
- Testing (UAT, regression, integration)
Out of Scope (for now)
- Contract migration (needs are unknown)
- Reinsurance reporting (explicitly not required)
- Automotive product types
Project Phases
Phase 1: Discovery & Requirements
Feb -- Early MarchOwners: CSM (Rocky), Amynta Ops, Product, Engineering
- Define detailed product requirements for each new product line
- Confirm adjudication flow, volumes, SLAs
- Gather API/menu integration requirements (Lightspeed specifics)
- Identify reporting requirements for claims & contract data
- Determine whether contract migration is required
- Document all business & technical requirements
Phase 2: Environment & Configuration
March -- AprilOwners: Product Configuration, Engineering
- Create TPA code in Amynta Warranty environment
- Set up PCMI environment to mirror Sym-Tech configuration
- Configure new product offerings
- Validate OEM-owned unit handling (25% volume)
- Configure split adjudication rules
Phase 3: Integrations
April -- MayOwners: Engineering, API Team, Menu Integration Team
- Scope & document Lightspeed and other menu integrations
- Define API calls needed for contract creation, rates, eligibility, etc.
- Engineering builds or configures API connectors
- Amynta testing of menu workflows
Phase 4: Reporting & Data Pipeline
MayOwners: Data Engineering, Reporting/Analytics
- Build contract & claims reporting pipelines
- Validate extract formats, cadence, and delivery
- Ensure split adjudication reporting flows correctly
Phase 5: Testing & Validation
June -- JulyOwners: QA, Amynta UAT Team, CSM Oversight
- Internal QA of configuration & integrations
- Amynta UAT across all product lines
- Performance testing for ~4k contracts/mo and ~1k claims/mo
- Validate menu integration end-to-end
- Validate reporting accuracy and completeness
Phase 6: Deployment & Launch
Late July -- AugustOwners: Product, Engineering, Amynta Leadership, CSM
- Final production configuration
- Deployment of integrations
- Go-live checklist review
- Jeff Town final signoff
- Launch aligned with August conference timeline
Milestones
| Milestone | Target Date | Status |
|---|---|---|
| Requirements completed | Early March | In Progress |
| TPA code + environment configured | April | Upcoming |
| Integration setup complete | May | Upcoming |
| Reporting pipeline validated | May | Upcoming |
| UAT complete | July | Upcoming |
| Executive signoff (Jeff Town) | Late July | Upcoming |
| Go-live | August (Conference) | Target |
Dependencies
- API documentation and integration requirements from Lightspeed
- Amynta confirmation on contract migration
- Product availability and configuration rules for new offerings
- Data engineering bandwidth for pipelines
- Executive approval from Jeff Town
Risks & Mitigations
Contract migration unexpectedly required
Start scoping early; plan contingency window
Menu integration/API complexity
Early engagement with Lightspeed; begin design in April
High UAT volume near deadline
Schedule UAT in waves and enforce entry criteria
Timeline reliance on August conference
Build two-week buffer before conference date
Next Steps
Project Overview
Visor Analytics will deliver a comprehensive F&I product protection platform for BRP, consisting of two parallel workstreams: PCRS Admin Platform configuration for 5 products (VSC New, VSC Used, Tire & Wheel, GAP, Theft) and a Simple Frontend Dealer Portal for MVP quote functionality. Target completion: August 8-15, 2026 for BRP Club / Dealer Show.
Deliverable 1
$149,600
PCRS Admin Platform (19 wks)
Deliverable 2
$116,160
Frontend Dealer Portal (14 wks)
Project Management
$41,800
Full-time PM (19 wks)
Grand Total
$307,560
5,592 hours @ $55/hr
Deliverable 1: PCRS Admin Platform — F&I Product Setup (5 Products) · 19-Week Envelope
| # | Work Item / Phase | Role (× Count) | Weeks | Total Hrs | Cost | Notes |
|---|---|---|---|---|---|---|
| Phase 1A: Requirements, Data Table Validation & PCRS Access (Wk 1-2 · Apr 7-18) | ||||||
| 1 | Requirements gathering — validate Amynta data tables, rate structures, tier logic, forms, loss codes; PCRS sandbox access | Business Analyst × 2 | 2 | 160 | $8,800 | CRITICAL: Validates data tables are clean before Phase 1B |
| Phase 1B: PCRS Product Deployment — 5 Products Sequential (Wk 3-17 · Apr 21 → Aug 1) | ||||||
| 2 | Product 1: VSC (New) · Wk 3-5 · Apr 21 → May 9 | Business Analyst × 2 | 3 | 240 | $13,200 | Install rates/forms, class/tier, loss codes, cancel rules |
| 3 | Product 2: VSC (Used) · Wk 6-8 · May 12 → May 30 | Business Analyst × 2 | 3 | 240 | $13,200 | Delta config from New; used-vehicle specifics |
| 4 | Product 3: Tire & Wheel · Wk 9-11 · Jun 2 → Jun 20 | Business Analyst × 2 | 3 | 240 | $13,200 | T&W-specific rate tables, coverage terms |
| 5 | Product 4: GAP · Wk 12-14 · Jun 23 → Jul 11 | Business Analyst × 2 | 3 | 240 | $13,200 | GAP eligibility, LTV rules, state regulations |
| 6 | Product 5: Theft · Wk 15-17 · Jul 14 → Aug 1 | Business Analyst × 2 | 3 | 240 | $13,200 | Theft product config, claims loss codes |
| QA: Starts After 1st Product Deploy — 2 QA Through End (Wk 5-19 · May 5 → Aug 15) | ||||||
| 7 | QA validation — each product tested as deployed; overlaps 1B, continues through 1C | QA Analyst × 2 | 15 | 1,200 | $66,000 | E2E: rates, eligibility, cancel, loss codes × 5 products |
| Phase 1C: Final UAT & Cross-Product Regression (Wk 18-19 · Aug 4-15) | ||||||
| 8 | BA final validation, cross-product regression & UAT support (all 5 products) | Business Analyst × 2 | 2 | 160 | $8,800 | Compress to 1 wk to land Aug 8 if QA clean |
| DELIVERABLE 1 SUBTOTAL · 19 Weeks | 2,720 | $149,600 | 2 BA full 19 wks + 2 QA 15 wks | |||
Deliverable 2: Simple Frontend Dealer Portal · 14 Weeks Parallel to D1 · Apr 7 → Jul 11
| # | Work Item / Phase | Role | Weeks | Total Hrs | Cost | Notes |
|---|---|---|---|---|---|---|
| Phase 2A: Design, Architecture & UX (Wk 1-3 · Apr 7-25) | ||||||
| 9 | UX/UI design & wireframes | UI/UX Designer | 3 | 108 | $5,940 | Dealer portal wireframes, BRP branding, responsive |
| 10 | Architecture & tech stack selection | Overall Tech Lead | 2 | 40 | $2,200 | Angular/.NET stack, API design, auth model |
| 11 | Requirements & user stories | Business Analyst | 3 | 90 | $4,950 | Feature specs, acceptance criteria for MVP quote flow |
| Phase 2B: Frontend Build + PCRS API Integration (Wk 3-10 · Apr 21 → Jun 13) | ||||||
| 12 | Angular frontend development | Angular Lead | 8 | 320 | $17,600 | Core quote flow, product selection, rate display, auth |
| 13 | Angular frontend development | Angular Developer 1 | 8 | 320 | $17,600 | UI components, forms, data binding, responsive layout |
| 14 | PCRS eRating API integration | .NET Lead | 6 | 216 | $11,880 | API auth, rate collection for 5 products, error handling |
| 15 | .NET backend services | .NET Developer 1 | 6 | 216 | $11,880 | Middleware, data mapping, session management |
| 16 | API endpoint — BEST handoff for non-qualifying deals | .NET Developer 2 | 3 | 90 | $4,950 | Handoff to BEST via API endpoint |
| Phase 2C: QA, UAT & Demo Prep (Wk 9-14 · Jun 2 → Jul 11) | ||||||
| 17 | QA testing — frontend + API E2E | QA Lead | 6 | 216 | $11,880 | E2E: quote flow, PCRS round-trip, BEST handoff, regression |
| 18 | QA execution & defect tracking | QA Engineer (Mid) | 6 | 216 | $11,880 | Test execution, defect logging, retest cycles |
| 19 | BA — UAT support & demo prep | Business Analyst | 4 | 80 | $4,400 | UAT coordination, demo script, showcase walkthrough |
| 20 | Angular bug fixes & polish | Angular Lead | 3 | 120 | $6,600 | Post-QA fixes, UX polish, performance optimization |
| 21 | Infrastructure & deployment | Infra/DevOps Engineer | 4 | 80 | $4,400 | Prod deploy, SSL, DNS, monitoring, CI/CD |
| DELIVERABLE 2 SUBTOTAL · 14 Weeks | 2,112 | $116,160 | MVP quote portal + PCRS bridge + BEST API | |||
Project Management — Full-Time, Spans D1 & D2 (19 Weeks · Apr 7 → Aug 15)
| # | Work Item | Role | Weeks | Total Hrs | Cost | Notes |
|---|---|---|---|---|---|---|
| PROJECT MANAGEMENT — Full-Time, Spans D1 & D2 (19 Weeks · Apr 7 → Aug 15) | ||||||
| 22 | Program Manager — full-time governance, Amynta coordination, BRP stakeholders, D1+D2 sprint mgmt, risk tracking, status reporting | Project Manager | 19 | 760 | $41,800 | Full-time: 2 parallel workstreams + vendor coordination |
| PM SUBTOTAL | 760 | $41,800 | Full-time PM across both deliverables | |||
| GRAND TOTAL — VISOR ESTIMATE ($55/hr Blended) | 5,592 | $307,560 | All @ $55/hr blended · Apr 7 → Aug 15 | |||
Incremental Deliverables & Milestones (April → August)
| Week / Date | Milestone |
|---|---|
| Wk 2 · Apr 18 | Requirements sign-off; data tables validated; PCRS access confirmed |
| Wk 3 · Apr 21 | D2 frontend build kicks off (parallel to D1) |
| Wk 5 · May 9 | Product 1 (VSC New) deployed in PCRS — 1st tangible deliverable |
| Wk 5 · May 5 | QA begins — validates Product 1 while Product 2 config starts |
| Wk 8 · May 30 | Product 2 (VSC Used) deployed in PCRS |
| Wk 10 · Jun 13 | D2 frontend core build complete; enters QA phase |
| Wk 11 · Jun 20 | Product 3 (Tire & Wheel) deployed in PCRS |
| Wk 14 · Jul 11 | Product 4 (GAP) deployed · D2 frontend delivered (UAT complete) |
| Wk 17 · Aug 1 | Product 5 (Theft) deployed — All 5 products configured in PCRS |
| Wk 18-19 · Aug 4-15 | Final cross-product UAT, regression & showcase prep |
| Aug 8-15 | PHASE 1 COMPLETE — Ready for BRP Club / Dealer Show |
Key Assumptions & Dependencies
- ALL RATES AT $55/HR BLENDED per VISOR MSA — no role-specific rate variation
- START DATE: April 7, 2026. TARGET: August 8-15, 2026 (19-week program)
- BIG ASSUMPTION: Amynta provides ALL data tables in clean, loadable format BEFORE Wk 3. Phase 1A (Wk 1-2) explicitly validates this — catches data quality issues at Wk 2, not Wk 10
- 5 products deployed SEQUENTIALLY: 3 wks each. QA starts after 1st product deploy, runs continuously
- BAs assigned full 19 wks — flex between config support, QA gap resolution, and UAT
- D1 and D2 run IN PARALLEL with independent resources. PM is FULL-TIME spanning both
- Frontend scope = MVP quote portal ONLY: quote + rate display + BEST API handoff for non-qualifying deals
- DMS (Lightspeed) integration is NOT ESTIMATED and NOT IN SCOPE — manual data entry assumed for Phase 1
- August showcase = pilot/demo with select dealers, not full production rollout
- Excludes: Infobus bridge, payment calculator, SAP/Snowflake, claims, eSign, DMS integration — Phase 2+